Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114
RRPG - Phase 2 - Métal Sartigan
Back to achievements

RRPG - Phase 2

AC1014
Spring 2016
|
Joliette, Quebec

Steel building intended for commercial use constructed in two phases.
RRPG head office and four industrial condos.

This project was carried out in collaboration with JHL Aviation Services inc. (Member of the Metal Sartigan network)

Width : 85'
Length : 73'
Height : 18'