Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114
Edelweiss Construction - Metal Sartigan
Back to achievements

Construction Edelweiss

AC1152
Summer 2018
|
Wakefield, QC

Steel building intended for industrial use.
Garage for heavy machinery.


This project was carried out in collaboration with Les industries Cama (Member of the Metal Sartigan network of authorized contractors)

Width : 95'
Length : 135'
Height : 22'
cross