Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114
Ferme Lejeune - Metal Sartigan
BK822
Summer 2012
|
Temiscouata-sur-le-Lac, Qc

Steel building intended for agricultural use.
Dairy farm.

This project was carried out in collaboration with Les Construction CB 2004 inc.
(Member of the network of Metal Sartigan authorized contractors)

Width : 64'
Length : 268'
Height : 9'
cross