Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114
Garage municipal Pont-Rouge - Métal Sartigan
Back to achievements

Garage municipal Pont-Rouge

AC1176
Hiver 2018
|
Pont-Rouge

Steel building intended for institutional use.
Garage municipal construit pour la municipalité de Saint-Rémi.


Ce projet a été réalisé en collaboration avec Construction Côté et Fils inc. (Membre du réseau d'entrepreneurs autorisés Métal Sartigan)

Width : 56'
Length : 70'
Height : 20'