Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114
Transportation Hudon - Metal Sartigan
Back to achievements

Transport Hudon

AC1085
Summer 2017
|
Saint-Jean-sur-Richelieu, Qc

Steel building intended for a transport company comprising office space and garage.


This project was carried out in collaboration with our authorized contractor Dorais inc. (Member of the network of Metal Sartigan authorized contractors).

Width : 79'
Length : 121'
Height : 24'
cross