Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the gravityperks domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in C:\inetpub\vhosts\volcan.design\metalsartigan.volcan.design\wp-includes\functions.php on line 6114
Fire station of Saint-Rémi - Metal Sartigan
Back to achievements

Caserne d'incendie de Saint-Rémi

BK614
Fall 2008
|
Saint-Rémi, Qc

Steel building intended for institutional use.
Fire station for the municipality of Saint-Rémi.


This project was carried out in collaboration with Dorais inc. (Member of the network of Metal Sartigan authorized contractors)

Width : 73'
Length : 109'
Height : 30'
cross